EV Charging Stack 800kW
Introduction:
This 1000v 800kW EV Charging Stack is a high-power fast charging solution for electric vehicles that require rapid energy replenishment. It is a good choice for the situations as below:
-
Public Charging Stations: Ideal for high-traffic locations like highway rest stops and urban hubs.
-
Fleet Operations: Perfect for commercial EV fleets, including buses and trucks, that require rapid turnaround times.
-
Future-Ready Infrastructure: Supports next-generation EVs with higher voltage and faster charging needs.
Features:
-
The maximum output power supported by a single gun is 600kW, charging for 3 minutes and a range of 200km;
-
The module has a built-in AC contactor, and the standby reactive power loss is 0;
-
1000V ultra-high voltage platform;
-
It adopts full matrix topology circuit, dynamic allocation, and Max. 16 charging guns;
-
Multiple modules work in parallel; G3 dust screen is used, and silencer shutters are used on the air inlet side;
-
Support operation and maintenance platform, remote fault diagnosis, and remote OTA and USB-OTA.
Specifications:
-
Module constant power range: 300-1000Vdc
-
Single-channel maximum output current: 250A
-
Altitude: <2000m, output must be derated above 2000m
-
GB2015-250A DC terminal size: 350mm*180mm*1400mm
-
600A liquid-cooled supercharger terminal size: 450mm*500mm*1650mm
-
Charging stack host size: 1800mm*835mm*1800mm
-
Input voltage: 380Vac +15%
-
Output voltage range: 200-1000Vdc
-
Maximum output current of the whole machine: 2666A
-
Working temperature: -20'℃~+65℃, output must be derated above 50℃
-
Input frequency: 45~65HZ
-
Module platform: 40kW
-
Peak efficiency of the whole machine: >96.3%
-
Working humidity: 5%-95%, non-condensing
-
Input power factor: 20.99
-
Number of DC output channels: 800kW maximum 16 channels (compatible with 6/8Л0Л2/4 channels)
-
Protection level: IP54
Technical Support – Presale
-
Initial Debugging and Testing: We can dispatch engineers and technicians to provide on-site guidance and coordinate the testing of vehicle end matching; Solving the matching problem of vehicle piles.
-
Technical Guidance or Training: To ensure that the charging station equipment can operate in good condition, technical training will be provided to the technical personnel of the entrusted party before product delivery.
Technical Support – Aftersale
-
Stage 1: Customer Hotline: Common issues in the instruction manual that require assistance from the customer service hotline center to resolve. We recommend customer service hotline centers in Germany, Norway and Türkiye. In other countries or regions, there are partners who can provide after-sales service support.
-
Stage 2: Online Guidance: For issues not mentioned in the manual, our after-sales engineers can remotely analyze and identify the specific cause. For software issues, we will remotely upgrade the charging station through the operation and maintenance platform. For hardware issues, we will notify our service partners to come to the site for hardware replacement.
-
Stage 3: On-site Service: Issues where there is no specific solution after remote online analysis. We will arrange engineers to the site for troubleshooting, including replacing parts.
CONTACT
Contact Us
Office Address
NO. 96, Chang'an Street, Airport Economy Zone, Zhengzhou, Henan, China.
Email: sanoenergy@163.com
Mob: +86-1859-5505-568
WhatsApp: +86-1859-5505-568